|
Frans added second starboard pitot for SMART ASS.
Date: 04/26/2010
Views: 4358
|
|
|
Richard_shoot_bushing
Date: 10/11/2009
Views: 6105
|
|
|
IMG_8060Ann
Date: 07/05/2008
Views: 4554
|
|
|
IMG_1255ann
The superfluous pump and plumbing removed. In addition, I connected the flaps to the electrical power source for the main pump (not shown). This provides power to the flaps through the old pump circuit breaker path. Tested and it works fine.
Date: 03/25/2011
Views: 3896
|
|
|
p1000702
p1000702.jpg
Date: 03/12/2012
Views: 10786
|
|
|
Fuel_System_29_001
Date: 05/19/2008
Views: 3884
|
|
|
Ron and Alan took turns working on starboard bracket.
Date: 01/20/2010
Views: 6480
|
|
|
Mass_Balance_Tower_21
Date: 01/23/2006
Views: 3660
|
|
|
IMG_1053
Date: 08/09/2007
Views: 5048
|
|
|
IMG_0092post
Date: 09/03/2010
Views: 4147
|
|
|
Annunciator sketch angle 3
Date: 07/02/2006
Views: 4356
|
|
|
P1250001
Date: 01/25/2007
Views: 6048
|
|
|
IMG_6147post
Date: 08/09/2009
Views: 3971
|
|
|
IMG_2160
Date: 12/21/2004
Views: 4603
|
|
|
IMG_4575
Date: 04/16/2012
Views: 14835
|
|
|
GJ7I1754
Date: 07/09/2006
Views: 4228
|
|
|
dscn0331
Date: 12/31/1969
Views: 3650
|
|
|
DSCF0050
Date: 10/27/2009
Views: 5508
|
|
|
Door sill conduit run 13.
Date: 08/11/2010
Views: 5643
|
|
|
CH17_22
Date: 12/31/1969
Views: 4396
|
|