|
|
IMG_0036
Date: 03/16/2007
Views: 6491
|
|
|
Port front tang rebate, going to use thin G-10 to cover gap.
Date: 10/16/2009
Views: 5543
|
|
|
|
10122002182041_G
Date: 12/31/1969
Views: 3992
|
|
|
IMG_1909
Date: 09/17/2004
Views: 6031
|
|
|
|
dsc08627
The monowheel landing gear is in the up position and resting on the main wheel with some of the weight held by the block and tackle. This was taken just before putting on the braces to keep her from rolling. Been trying to get rid of that tv in the back
Date: 04/14/2012
Views: 30527
|
|
|
Eric Engineering torque wrench extension
Date: 12/03/2013
Views: 9288
|
|
|
|
Port lift strut complete 1.
Date: 12/28/2009
Views: 5875
|
|
|
DSCN5343Ann
Date: 12/28/2006
Views: 4726
|
|
|
|
IMG_6476post
Date: 09/07/2009
Views: 7317
|
|
|
IMG_0129post
Date: 08/11/2009
Views: 6430
|
|
|
|
IM002180
Date: 10/30/2007
Views: 8704
|
|
|
Vertical upright, swing-arm and generator install 6 of 7.
Date: 08/12/2003
Views: 12306
|
|
|
|
Door hinge rebates 44.
Date: 11/10/2009
Views: 6636
|
|
|
LG_Issue13
Date: 04/30/2004
Views: 5163
|
|
|
|
Door sill conduit run 13.
Date: 08/11/2010
Views: 7293
|
|
|
Baggage_Area_01_001
Date: 05/19/2008
Views: 6897
|
|
|
|
DSCN5169
Date: 11/29/1999
Views: 5224
|
|
|
Making awful fit of lift pads correct 4.
Date: 10/12/2010
Views: 6107
|
|
|
|
IMG_0028
2010 07 11 - Flew again! No flight pics. This ground pic will have to do. Flew 1.5, all in the pattern. T/O & L practice. Muchly needed after 4 months off. All full stop & taxi back. No bounce & go's yet. Comfort is returning. Little
Date: 07/02/2010
Views: 5945
|
|
|
StbdAileronMovement03
Date: 11/29/1999
Views: 5203
|
|