|
DSCN5247Ann
Date: 12/17/2006
Views: 3279
|
|
|
DSCN8255
Date: 09/18/2010
Views: 3102
|
|
|
RudderPedal17
Date: 02/12/2004
Views: 3096
|
|
|
05122002185909_G
Date: 12/31/1969
Views: 2886
|
|
|
02052008050_G
Date: 10/14/2009
Views: 4676
|
|
|
22092002165148_G
Date: 12/31/1969
Views: 2352
|
|
|
IMG_1446ann
Final brake plumbing and other stuff installed below the tunnel.
Date: 06/04/2011
Views: 2610
|
|
|
IMG_6657
Date: 06/06/2017
Views: 6273
|
|
|
Aligning_wings_pins_19
Date: 04/15/2006
Views: 3442
|
|
|
Needs some steering.
Date: 10/08/2009
Views: 3072
|
|
|
DSCF0006
Date: 01/26/2009
Views: 3610
|
|
|
Airmaster01small
Date: 09/29/2005
Views: 3280
|
|
|
DSCN6641
Date: 10/25/2009
Views: 2687
|
|
|
IM003618
Date: 11/24/2007
Views: 4312
|
|
|
DSCN6044
Date: 10/11/2009
Views: 4273
|
|
|
IMG_5106
Date: 11/04/2012
Views: 5323
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 12414
|
|
|
DSCN5570Ann
Date: 02/25/2007
Views: 3123
|
|
|
Strut 3
Date: 12/23/2009
Views: 3026
|
|
|
oh_xjo_ivl16
Date: 07/26/2007
Views: 3108
|
|