|
|
IMG_7233
2-ply fiberglass strips were made up to be bonded to the inside of the unit. These strips went on all 4 sides. Here the strip is being bonded to the aft wall.
Date: 01/26/2014
Views: 10012
|
|
|
Lay_2
Date: 12/10/2008
Views: 6683
|
|
|
|
White, red and green.
Date: 05/01/2010
Views: 5083
|
|
|
Control_Systems_53
Date: 01/23/2006
Views: 4504
|
|
|
|
FuelFiller02
Date: 06/14/2004
Views: 4263
|
|
|
Label panel 1
Date: 06/12/2010
Views: 3227
|
|
|
|
Streetlamp4
Date: 01/30/2009
Views: 5930
|
|
|
img0608copy
Date: 07/29/2007
Views: 3820
|
|
|
|
101002_airscp
Date: 01/17/2006
Views: 6818
|
|
|
Oshkosh_2009_023
Date: 07/27/2009
Views: 8906
|
|
|
|
Tailplane_77
Date: 01/23/2006
Views: 3367
|
|
|
46_G
Date: 06/19/2009
Views: 4269
|
|
|
|
CH18_29
Date: 12/31/1969
Views: 4139
|
|
|
TrimRelayDeck05
Date: 09/16/2004
Views: 3221
|
|
|
|
Generator harness install 2 of 2.
Date: 08/12/2003
Views: 8372
|
|
|
Prestwick_Scotland_EGPK_1_6_09_air_to_air_Tanker
Date: 06/01/2009
Views: 5520
|
|
|
|
Bonding of Starboard lift pin sockets 18.
Date: 10/20/2010
Views: 6227
|
|
|
IMG_0876post
Put the aircraft back in the hanger and put the cowl back on to wait for a better day to fly.
Date: 01/24/2010
Views: 5169
|
|
|
|
IMG_8011Ann
Date: 07/05/2008
Views: 4715
|
|
|
P1010104
Date: 11/29/1999
Views: 5381
|
|