|
|
FWF-10 (7)
Date: 11/28/2009
Views: 11349
|
|
|
Starboard_wing_tip_Y9_06_07
Date: 06/07/2009
Views: 8839
|
|
|
|
FuselageCradle02
Date: 09/19/2003
Views: 5852
|
|
|
Single point ground 3.
Date: 06/08/2010
Views: 5977
|
|
|
|
IMG_0721
Date: 10/31/2005
Views: 5481
|
|
|
N28ET_Rev
Date: 08/25/2005
Views: 5302
|
|
|
|
IMG_1471ann
2011 01 27 One final check of alignment before drilling.
Date: 01/27/2011
Views: 4944
|
|
|
MatcoJamar Brakes.jpg
Date: 03/21/2010
Views: 4673
|
|
|
|
IMG_8751post
Date: 08/10/2009
Views: 6669
|
|
|
shorai batterry , 2 pound weight , 18 amps capacity
Date: 11/01/2015
Views: 10323
|
|
|
|
04072002164423_G
Date: 12/31/1969
Views: 3979
|
|
|
IMG_9571post
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
Date: 06/12/2010
Views: 6841
|
|
|
|
Time to start wiring.
Date: 02/27/2009
Views: 13075
|
|
|
DSC_0251
Date: 05/15/2008
Views: 5323
|
|
|
|
IMG_3230ann
Date: 02/01/2009
Views: 6457
|
|
|
Dynon AOA audio pot 2.
Date: 08/04/2010
Views: 19134
|
|
|
|
Collar
Date: 10/25/2008
Views: 8584
|
|
|
dscn2736
Date: 12/31/1969
Views: 4076
|
|
|
|
IMG_5720Ann
Date: 10/21/2007
Views: 5552
|
|
|
DSCN6157
Date: 10/11/2009
Views: 4889
|
|