|
|
PortWingAccess1
Date: 12/10/2003
Views: 5200
|
|
|
MG_2897
Date: 03/17/2008
Views: 4770
|
|
|
|
IMG_9570ann
2010 06 12 - Completed the plumbing for the new mechanical fuel pump this morning. Fire shield on all fuel lines. Everything connected in the proper sequence.
Date: 06/12/2010
Views: 5409
|
|
|
Paul_McA_s_breather_installation
Date: 12/31/1969
Views: 6360
|
|
|
|
Front HardPoint 9
Date: 12/31/2013
Views: 9722
|
|
|
FuelFiller04Ann
Date: 06/22/2004
Views: 3526
|
|
|
|
DSCN6166
Date: 10/11/2009
Views: 4750
|
|
|
DSCN5299Ann
Date: 12/21/2006
Views: 4112
|
|
|
|
Solar 1
Date: 05/08/2011
Views: 7892
|
|
|
Going to taper sand away about half thickness of aluminium at tip 1.
Date: 10/22/2009
Views: 5454
|
|
|
|
dsc09018
Started to make the axle jig. Used a simple setup of first taking large flat blocks of wood and caulking it to the floor somewhere over FS70. Then that allows me to fix the aluminum angle with a single screw once in its final position.
Date: 01/10/2013
Views: 20998
|
|
|
108_0829_IMG
Date: 10/15/2003
Views: 6381
|
|
|
|
GJ7I2427
Date: 07/09/2006
Views: 4715
|
|
|
Peroxide Syringe
Date: 12/31/2010
Views: 7445
|
|
|
|
Photo_052007_001
Date: 05/20/2007
Views: 3926
|
|
|
11Inverted_from_front
Date: 09/03/2004
Views: 6030
|
|
|
|
Wing 1.
Date: 06/03/2009
Views: 7147
|
|
|
dscn0725
Date: 12/31/1969
Views: 4075
|
|
|
|
Front Port fuse stiffening for lift socket 1.
Date: 11/05/2010
Views: 6441
|
|
|
Aft sill cover 22.
Date: 09/03/2010
Views: 6999
|
|