|
|
StrobeMountPlate02
Date: 02/09/2004
Views: 4806
|
|
|
IMG_2681
2012 04 09 Well, after 4 weeks and buckets of DOT5 spent trying to make the Jaymar master cylinders work I have given up. They are just crap. So I'm taking the base of their base and building a new brake master setup using MATCO MC-4A master cylinders.
Date: 04/07/2012
Views: 6801
|
|
|
|
IMG_0004
Date: 05/06/2007
Views: 5735
|
|
|
Fred fitting fairings 10.
Date: 02/21/2009
Views: 5387
|
|
|
|
DSC00910
Date: 04/15/2005
Views: 6308
|
|
|
DSCN3914
Date: 09/30/2005
Views: 4662
|
|
|
|
GJ7I2427
Date: 07/09/2006
Views: 4750
|
|
|
InstrumentPanel59Ann
Date: 09/22/2004
Views: 4268
|
|
|
|
Door hinge rebates 21.
Date: 11/03/2009
Views: 4730
|
|
|
IMG_4593
Date: 05/03/2012
Views: 12681
|
|
|
|
2005_1_16_28
Date: 02/03/2009
Views: 5702
|
|
|
Starboard_flap_1_Y9_06_07
Date: 06/07/2009
Views: 6816
|
|
|
|
img0199copy
Date: 07/29/2007
Views: 5235
|
|
|
IMG_0005
Date: 04/14/2007
Views: 8403
|
|
|
|
First pass of Port top wingskin bond on 4.
Date: 09/11/2010
Views: 6167
|
|
|
IMG_6855
But I can't get it past the entrance to the tank. Looks like I'll have to tear into things.
Date: 10/01/2013
Views: 8961
|
|
|
|
Ceiling panel attachment layout
Date: 03/03/2009
Views: 11680
|
|
|
IMG_2434Ann
Date: 11/09/2008
Views: 4719
|
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 171795
|
|
|
Mass_Balance_Tower_02
Date: 01/23/2006
Views: 10284
|
|