|
|
IMG_1335ann
And the second work bench with the port wing in place and ready for work. Took a long day to build the benches but they are worth all the effort.
Date: 10/08/2010
Views: 3654
|
|
|
IMG_5720Ann
Date: 10/21/2007
Views: 5183
|
|
|
|
Door sill conduit run 14.
Date: 08/11/2010
Views: 7134
|
|
|
DSCN6436
Date: 10/24/2009
Views: 6050
|
|
|
|
IMGA0707
The next day me and my helper Ang did the other wing. This time it only took 6 and half hours so left us time to trim the other wing
Date: 04/21/2013
Views: 95370
|
|
|
Fuel_System_06
Date: 01/23/2006
Views: 6911
|
|
|
|
DSCN6236
Date: 10/11/2009
Views: 6566
|
|
|
Fin cap fair .5
Date: 03/30/2009
Views: 7837
|
|
|
|
Autopilot_40
Date: 05/19/2008
Views: 6433
|
|
|
Upholstery 3
Date: 03/05/2018
Views: 14597
|
|
|
|
DSCN6164Ann
Date: 06/24/2007
Views: 20661
|
|
|
DSCN5931Ann
Date: 04/25/2007
Views: 4104
|
|
|
|
lake down below
Date: 03/04/2016
Views: 7493
|
|
|
Screwball article Beacon 12-2007
Date: 08/10/2010
Views: 6609
|
|
|
|
03122002190121_G
Date: 12/31/1969
Views: 4137
|
|
|
108_0840_IMG
Date: 10/23/2003
Views: 7119
|
|
|
|
IMG_6307post
Date: 08/09/2009
Views: 6276
|
|
|
MG_1703
Date: 07/09/2006
Views: 4739
|
|
|
|
DSC00006
Date: 12/31/1969
Views: 10157
|
|
|
img0787copy
Date: 07/29/2007
Views: 3359
|
|