|
|
Rudder_hdw_4
Date: 05/14/2009
Views: 6518
|
|
|
dscn0722
Date: 12/31/1969
Views: 5541
|
|
|
|
DSCF0024
Date: 01/09/2010
Views: 7827
|
|
|
DSCF0049
Date: 10/27/2009
Views: 8250
|
|
|
|
Overview of generator and swing-arm 1 of 4.
Date: 08/12/2003
Views: 16572
|
|
|
DSCN6121
Date: 10/11/2009
Views: 6765
|
|
|
|
dsc09021
BIG THANK YOU to my Uncle Kim Prout for flying out to help me with getting the gear legs set. He also helped me slow down and plan ahead. As an excited new builder its easy to get in a rush to try achieve something tangible. Im sure after that week of b
Date: 01/22/2013
Views: 20048
|
|
|
IMG_6473post
Date: 09/07/2009
Views: 6943
|
|
|
|
DSCF0020_1
Date: 07/02/2009
Views: 4677
|
|
|
Mid door pin and striker for port door 3.
Date: 12/28/2009
Views: 6799
|
|
|
|
IMG_0845
Date: 11/17/2005
Views: 6493
|
|
|
Battery_box_4
Date: 01/12/2009
Views: 6719
|
|
|
|
109_0973_IMG_2
Date: 01/28/2004
Views: 8408
|
|
|
Fuse post bond 5.
Date: 05/02/2009
Views: 5934
|
|
|
|
phpop_ehho1
Date: 02/09/2008
Views: 5922
|
|
|
CIMG0031
Date: 08/04/2005
Views: 8029
|
|
|
|
Landing_Gear_34
Date: 01/23/2006
Views: 3714
|
|
|
Front fuse conduit run 40.
Date: 12/08/2010
Views: 9750
|
|
|
|
06032003230833_G
Date: 12/31/1969
Views: 4063
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 193421
|
|