Login
EuropaOwners Random Items
Advanced Search

Random Images

CH8_10

CH8_10

Date: 12/31/1969 Views: 8878

IMG_2158

IMG_2158

Date: 12/20/2004 Views: 6099

Sternpost bonding 4.

Sternpost bonding 4.

Date: 05/07/2009 Views: 6661

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 797269

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 797269

Random Items

Date: 03/24/2026
Owner: Guest
Size: 84 items
nextlast
Rudder_hdw_4

Rudder_hdw_4

Date: 05/14/2009
Views: 6518
dscn0722

dscn0722

Date: 12/31/1969
Views: 5541
DSCF0024

DSCF0024

Date: 01/09/2010
Views: 7827
Keywords: Fuselage
DSCF0049

DSCF0049

Date: 10/27/2009
Views: 8250
Overview of generator and swing-arm 1 of 4.

Overview of generator and swing-arm 1 of 4.

Date: 08/12/2003
Views: 16572
DSCN6121

DSCN6121

Date: 10/11/2009
Views: 6765
dsc09021

dsc09021

BIG THANK YOU to my Uncle Kim Prout for flying out to help me with getting the gear legs set. He also helped me slow down and plan ahead. As an excited new builder its easy to get in a rush to try achieve something tangible. Im sure after that week of b

Date: 01/22/2013
Views: 20048
Add Photo To Cart
IMG_6473post

IMG_6473post

Date: 09/07/2009
Views: 6943
DSCF0020_1

DSCF0020_1

Date: 07/02/2009
Views: 4677
Mid door pin and striker for port door 3.

Mid door pin and striker for port door 3.

Date: 12/28/2009
Views: 6799
IMG_0845

IMG_0845

Date: 11/17/2005
Views: 6493
Battery_box_4

Battery_box_4

Date: 01/12/2009
Views: 6719
109_0973_IMG_2

109_0973_IMG_2

Date: 01/28/2004
Views: 8408
Fuse post bond 5.

Fuse post bond 5.

Date: 05/02/2009
Views: 5934
phpop_ehho1

phpop_ehho1

Date: 02/09/2008
Views: 5922
CIMG0031

CIMG0031

Date: 08/04/2005
Views: 8029
Landing_Gear_34

Landing_Gear_34

Date: 01/23/2006
Views: 3714
Front fuse conduit run 40.

Front fuse conduit run 40.

Date: 12/08/2010
Views: 9750
06032003230833_G

06032003230833_G

Date: 12/31/1969
Views: 4063
Aluminum Plenum flanges installed

Aluminum Plenum flanges installed

Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed

Date: 01/01/2011
Views: 193421
Add Photo To Cart
nextlast
Page: 1 2 3 4 5
Powered by Gallery v2.3