|
|
DSC00082_Texted
Date: 12/31/1969
Views: 5083
|
|
|
IMG_2065
The GRT Sport has arrived and almost all the instruments have been set in their panels. This is a test fit. It was necessary to adjust the big opening in the main for clearance of some of the various instruments.
Date: 11/05/2011
Views: 8610
|
|
|
|
Port headrest aft cover 2.
Date: 07/11/2010
Views: 8650
|
|
|
DSCN3956
Date: 09/30/2005
Views: 4522
|
|
|
|
DSCN5151
Date: 11/29/1999
Views: 4895
|
|
|
IMG_0977Ann
Date: 08/06/2007
Views: 6376
|
|
|
|
img0284copy
Date: 07/29/2007
Views: 4208
|
|
|
Door mechanism cover install 3.
Date: 11/07/2010
Views: 9462
|
|
|
|
DSCN4995Ann
Date: 12/06/2006
Views: 4469
|
|
|
DSCN6594
Date: 10/25/2009
Views: 4612
|
|
|
|
dsc08965
Port side after layups and peel ply removed. Notice shape of hole for the angle of the LG socket. I wrapped the LG socket with sandpaper and used it to form the hole.
Date: 10/01/2012
Views: 22432
|
|
|
IMG_1682
Date: 06/24/2004
Views: 6234
|
|
|
|
dscn2190
Date: 12/31/1969
Views: 4343
|
|
|
DSC_0222
Date: 05/15/2008
Views: 4671
|
|
|
|
P1010319
Date: 12/31/1969
Views: 5775
|
|
|
RudderMount29Ann
Date: 07/01/2004
Views: 3985
|
|
|
|
DSCN6494
Date: 10/25/2009
Views: 4414
|
|
|
IMG_0190
Date: 04/14/2005
Views: 4828
|
|
|
|
dscn0920
Date: 12/31/1969
Views: 4067
|
|
|
LR tank transfer punp
Date: 09/18/2010
Views: 7327
|
|