|
|
DSCF0740
Date: 08/03/2003
Views: 7465
|
|
|
DSC00947
Date: 12/31/1969
Views: 13562
|
|
|
|
Completion of Port top skin bond on 60.
Date: 09/22/2010
Views: 5741
|
|
|
20050215_IMG_0014
Date: 02/15/2005
Views: 5698
|
|
|
|
109_0922_IMG
Date: 01/07/2004
Views: 6637
|
|
|
IMG_1255ann
The superfluous pump and plumbing removed. In addition, I connected the flaps to the electrical power source for the main pump (not shown). This provides power to the flaps through the old pump circuit breaker path. Tested and it works fine.
Date: 03/25/2011
Views: 4375
|
|
|
|
Dover_Harbour
Date: 05/08/2009
Views: 6526
|
|
|
liberty_15
Date: 07/20/2007
Views: 6181
|
|
|
|
photo
No pictures of the progress of putting in the LG layups on the port side. Here I am putting down the peel ply.
Date: 08/20/2012
Views: 47121
|
|
|
Fin rib complete 4.
Date: 05/05/2009
Views: 6376
|
|
|
|
Fitting_Wings_18
Date: 06/07/2007
Views: 6475
|
|
|
IMG_3088
Date: 01/13/2011
Views: 9143
|
|
|
|
Engine2FrameBolts00
Date: 04/13/2004
Views: 4536
|
|
|
13062002131345_G
Date: 12/31/1969
Views: 3866
|
|
|
|
DSCF0681
Date: 08/01/2003
Views: 7231
|
|
|
IMG_0239
Date: 04/15/2005
Views: 4162
|
|
|
|
10112002184616_G
Date: 12/31/1969
Views: 4577
|
|
|
IMG_0002_001
Date: 04/14/2007
Views: 5994
|
|
|
|
CH21_8mod
Date: 04/23/2005
Views: 5470
|
|
|
IMG_1692
Began serious work on plumbing the brakes. Here you can see the flap switch wiring there to the left.
Date: 05/10/2011
Views: 5155
|
|