|
|
IMG_6956
Back side of the new tank.
Date: 10/17/2013
Views: 9399
|
|
|
img0326copy
Date: 07/29/2007
Views: 4077
|
|
|
|
Panel_07
Date: 01/23/2006
Views: 4609
|
|
|
2005_1_2_20
Date: 02/04/2009
Views: 4728
|
|
|
|
IMG_2086
Date: 12/01/2004
Views: 8058
|
|
|
IMG_0120
Date: 01/05/2007
Views: 7465
|
|
|
|
AileronCloseout16
Date: 06/04/2003
Views: 5660
|
|
|
DSC00077_Texted
Date: 12/31/1969
Views: 5435
|
|
|
|
DSCF0732
Date: 08/02/2003
Views: 6547
|
|
|
IMG_5409
Date: 06/26/2013
Views: 7770
|
|
|
|
Generator tension cord 2 of 4.
Date: 08/12/2003
Views: 9878
|
|
|
DSC_0320
Date: 09/21/2007
Views: 12594
|
|
|
|
taxing ot for first flight May21 2007
Taxing out for G-IVER first flight May 21 2008
Date: 05/21/2008
Views: 5787
|
|
|
040102_doorhinge10
Date: 12/31/1969
Views: 4035
|
|
|
|
040202_ventduct13
Date: 12/31/1969
Views: 3734
|
|
|
DSCN6101
Date: 10/11/2009
Views: 5499
|
|
|
|
New MC-4A 09
The MC-4A's with brake levers are assembled and positioned to allow the location for the aft holes to be established.
Date: 04/15/2012
Views: 5154
|
|
|
GJ7I2448
Date: 07/09/2006
Views: 4177
|
|
|
|
010325_035
Date: 12/31/1969
Views: 4027
|
|
|
IMG_1280ann
Poly has been taped over the front half. This will prevent the interior layup from sticking to the front half forming the joining flange. The front and rear have been taped together in preparation for the inner layup.
Date: 03/29/2011
Views: 4717
|
|