|
DSCN6170
Date: 10/11/2009
Views: 4265
|
|
|
PortWingAileronDisp03
Date: 10/29/2003
Views: 4304
|
|
|
Fuselage_02_001
Date: 06/09/2007
Views: 4343
|
|
|
CH18_31
Date: 12/31/1969
Views: 3859
|
|
|
DSC_0291
Date: 05/15/2008
Views: 5393
|
|
|
Emergency Maneuver that starts with Heim? 4 of 13
Date: 12/16/2013
Views: 6811
|
|
|
InstrumentPanel46Ann
Date: 07/23/2004
Views: 3267
|
|
|
IMG_0241
Date: 04/15/2005
Views: 3769
|
|
|
N4211W wing rigging 6.
Date: 10/11/2010
Views: 5730
|
|
|
IMG_7747Ann
Date: 06/07/2008
Views: 3743
|
|
|
CBM - 36 - HARNESS
Date: 11/18/2013
Views: 3227
|
|
|
Resize_of_DSC01527_Texted_001
Date: 12/31/1969
Views: 41481
|
|
|
DSCN8253
Date: 09/18/2010
Views: 6106
|
|
|
IMG_0120post
Date: 09/03/2010
Views: 3854
|
|
|
DSCN6232
Date: 10/11/2009
Views: 4110
|
|
|
Oil_Pan_input
I put two 1.25 inch holes on either side of the shark's tooth. They empty into a rectangular plenum about 4 X 2.5 that is terminated about 1/4 inch in front of the oil pan. The pan has cooling strips and the outside air contributes to oil cooling.
Date: 08/31/2011
Views: 206384
|
|
|
DSC00261
Date: 12/31/1969
Views: 4629
|
|
|
dscn0813
Date: 12/31/1969
Views: 3204
|
|
|
Ireland_Trip_Galway
Date: 05/08/2003
Views: 5051
|
|
|
13112003201315_G
Date: 12/31/1969
Views: 3393
|
|