|
|
DSCN4006
Date: 10/31/2005
Views: 5735
|
|
|
2006SnF012
Date: 04/07/2006
Views: 5495
|
|
|
|
DSC00915
Date: 04/15/2005
Views: 7298
|
|
|
DSCN5425
Date: 07/18/2009
Views: 6680
|
|
|
|
CH9_3
Date: 12/31/1969
Views: 36483
|
|
|
01_G
Date: 06/19/2009
Views: 4477
|
|
|
|
IMG_7393
Shot bags (25 lbs each) to hold the top in place for the final bonding. 2 plies of fiberglass over a micro filler in the cut.
Date: 03/01/2014
Views: 9676
|
|
|
IMG_6966
Selfie of the protective gear needed. There was a LOT of fiberglass dust flying during the cutting.
Date: 10/17/2013
Views: 9278
|
|
|
|
44_theigh_braces2
Date: 12/31/1969
Views: 3453
|
|
|
dsc09060
Wetting out stbd side.
Date: 01/24/2013
Views: 17549
|
|
|
|
CH20_2
Date: 12/31/1969
Views: 3768
|
|
|
PitchPushTube02
Date: 01/21/2004
Views: 5003
|
|
|
|
Starboard wing 7.
Date: 06/12/2009
Views: 6101
|
|
|
110502_cowelflap
Date: 12/31/1969
Views: 4503
|
|
|
|
DSCN5443
Date: 07/20/2009
Views: 6024
|
|
|
IMG_0022post
Date: 08/30/2010
Views: 7299
|
|
|
|
DSCN5236
Date: 11/29/1999
Views: 6807
|
|
|
DSCN3663
Date: 12/31/1969
Views: 4557
|
|
|
|
DSCN3560
Date: 12/31/1969
Views: 4004
|
|
|
IMG_7313
The filler neck and vent installed in the tank.
Date: 02/17/2014
Views: 9647
|
|