|
|
Door sill conduit run 35.
Date: 08/16/2010
Views: 6870
|
|
|
DSCN5426Ann
Date: 12/29/2006
Views: 4462
|
|
|
|
Downlatch
Date: 10/25/2008
Views: 6475
|
|
|
dscn0381
Date: 12/31/1969
Views: 4875
|
|
|
|
IMG_2250Ann
Date: 10/05/2008
Views: 5820
|
|
|
dscn1111
Date: 12/31/1969
Views: 4495
|
|
|
|
DSCN4717Ann
Date: 09/03/2006
Views: 5782
|
|
|
IMG_2091
Date: 12/01/2004
Views: 7083
|
|
|
|
IMG_0025post
Date: 08/30/2010
Views: 7858
|
|
|
Going to taper sand away about half thickness of aluminium at tip 1.
Date: 10/22/2009
Views: 5807
|
|
|
|
P8310026
Date: 09/09/2007
Views: 9537
|
|
|
dsc09022
Here you see I used bondo on the shims and screwed them down into the block. The shims made sure the guide was level. Also note the hole drilled in the Aluminum angle and the shim. This is where I fixed the guide for the curing stage to ensure nothing
Date: 01/22/2013
Views: 21739
|
|
|
|
Sternpost14Ann
Date: 06/28/2004
Views: 4186
|
|
|
109_0924_IMG
Date: 01/07/2004
Views: 6540
|
|
|
|
IMG_6110post
Date: 08/09/2009
Views: 5834
|
|
|
DSCN6208
Date: 10/11/2009
Views: 5601
|
|
|
|
Aft sill cover 7.
Date: 08/31/2010
Views: 9699
|
|
|
IMG_1669
Evaluating how the reservoir will be mounted/attached.
Date: 04/13/2011
Views: 4683
|
|
|
|
Starboard 37 pin connector.
Date: 01/21/2003
Views: 9698
|
|
|
IMG_0853
Date: 11/18/2005
Views: 5058
|
|