|
|
fuel_6
Date: 12/31/1969
Views: 7061
|
|
|
Jewel-Pee 2.
Date: 12/31/1970
Views: 8965
|
|
|
|
CockpitModuleReinforcementPort
Date: 10/07/2003
Views: 5645
|
|
|
Aft sill cover 23.
Date: 09/03/2010
Views: 7940
|
|
|
|
IMG_0326
Date: 04/17/2005
Views: 4776
|
|
|
DSCN6231
Date: 10/11/2009
Views: 5983
|
|
|
|
IMG_1726
Date: 07/10/2004
Views: 6176
|
|
|
CH9_3
Date: 12/31/1969
Views: 36473
|
|
|
|
06112010502
Date: 11/06/2010
Views: 6307
|
|
|
IMG_7233
2-ply fiberglass strips were made up to be bonded to the inside of the unit. These strips went on all 4 sides. Here the strip is being bonded to the aft wall.
Date: 01/26/2014
Views: 11221
|
|
|
|
DSCN6652
Date: 10/25/2009
Views: 4290
|
|
|
InstrumentPanel97Ann
Date: 11/30/2005
Views: 3889
|
|
|
|
IMG_5396
Date: 05/09/2013
Views: 6694
|
|
|
DSCN3573
Date: 12/31/1969
Views: 3763
|
|
|
|
Before closing E-bus switch, open Alternator switch first.
Date: 03/01/2011
Views: 3434
|
|
|
dsc08960
Stb side after layups and peel ply removed.
Date: 10/01/2012
Views: 22308
|
|
|
|
c_Shoulder Strap Roof Mount.jpg
Date: 03/22/2010
Views: 4304
|
|
|
Test_Flight
Date: 05/06/2006
Views: 26101
|
|
|
|
Dolly 7
Date: 02/14/2014
Views: 14061
|
|
|
IMG_8181Ann
Date: 07/18/2008
Views: 5466
|
|