|
|
Archer_6_antenna_install_15
Date: 01/23/2009
Views: 5440
|
|
|
Aft fuse conduit run 10.
Date: 08/19/2010
Views: 6415
|
|
|
|
IM003681
Date: 12/02/2007
Views: 7494
|
|
|
40_G
Date: 06/19/2009
Views: 4300
|
|
|
|
2005_DSCF0123
Date: 02/04/2009
Views: 4145
|
|
|
IMG_0030
Date: 04/28/2007
Views: 5306
|
|
|
|
Transylvania County Airport, NC
Date: 04/13/2010
Views: 7362
|
|
|
DSCN4805Ann
Date: 10/29/2006
Views: 4955
|
|
|
|
WingSet61Ann
Date: 07/29/2004
Views: 2961
|
|
|
Rudder_cracks_2_Y9_06_07
Date: 06/07/2009
Views: 4556
|
|
|
|
Length of coupler is ~ .855" cut down from 1". 9.5 times two is 19, so this allows minimum of 19 threads of engagement
Date: 12/13/2013
Views: 6156
|
|
|
Starboard wing 40.
Date: 06/20/2009
Views: 5532
|
|
|
|
DSCF0087
Date: 04/02/2009
Views: 3399
|
|
|
Jim Brown 8.
Date: 01/06/2011
Views: 7802
|
|
|
|
DSCF0007_004
Date: 09/08/2009
Views: 4181
|
|
|
Bonding Port lift pin sockets 7.
Date: 10/28/2010
Views: 6161
|
|
|
|
Fuse_fill_1
Date: 09/14/2009
Views: 9676
|
|
|
IMG_1412
Another issue with the pre-built cockpit module. The fuel tank was not supported on the aluminum angle. Bud suggested this could cause tank cracking and recommended some sort of support be added. I cut a wedge from a length of balsa and covered it with
Date: 05/28/2011
Views: 5604
|
|
|
|
Port rudder cable guide 2
Date: 05/29/2009
Views: 7791
|
|
|
30_09_07_1
Date: 09/30/2007
Views: 4956
|
|