|
|
DSC04015_Large_post
Date: 10/19/2009
Views: 5652
|
|
|
Relieved for starter switch and starter LED.
Date: 07/19/2010
Views: 6487
|
|
|
|
DSCN5220
Date: 11/29/1999
Views: 6111
|
|
|
24062002180013_G
Date: 12/31/1969
Views: 4917
|
|
|
|
IMG_7366
Applying the fiberglass/epoxy strips to the port side. Plastic wrap to prevent the epoxy from bonding to the tools used to hold the strip in place.
Date: 02/22/2014
Views: 12662
|
|
|
109_0949_IMG
Date: 01/17/2004
Views: 6589
|
|
|
|
IMG_6982
The tank must go into this space.
Date: 10/21/2013
Views: 12682
|
|
|
PitotStaicTubing09
Date: 11/26/2002
Views: 11498
|
|
|
|
oh_xjo_ivl7
Date: 03/07/2007
Views: 7697
|
|
|
Ant_3
Date: 02/11/2009
Views: 6571
|
|
|
|
CH4_7
Date: 12/31/1969
Views: 6991
|
|
|
Control_Systems_3_001
Date: 05/19/2008
Views: 4794
|
|
|
|
Fuse port bad gelcoat 4.
Date: 09/11/2009
Views: 7309
|
|
|
Wing 1.
Date: 06/03/2009
Views: 7546
|
|
|
|
Flap extension 2
Date: 10/30/2013
Views: 6887
|
|
|
IMG_0768
Date: 11/11/2005
Views: 5685
|
|
|
|
SingletonFirewall10Ann
Date: 04/15/2006
Views: 4440
|
|
|
IMG_0154
Date: 04/14/2005
Views: 5613
|
|
|
|
DSC00290
Date: 12/31/1969
Views: 6098
|
|
|
BED2 - of couse, fuselage must be horizontal
Date: 04/23/2008
Views: 5683
|
|