|
IMG_0693
Date: 10/29/2005
Views: 2809
|
|
|
Xponder00Ann
Date: 04/22/2004
Views: 2146
|
|
|
24_04_08_vliegfoto_s_083
Date: 04/26/2008
Views: 1961
|
|
|
Rivets
Next problem. Once the push rod end was fitted and drilled according to the manual the rivets provided were too short to go through the whole structure. Awaiting a response from Europa
Date: 09/03/2015
Views: 7668
|
|
|
img0856copy
Date: 07/29/2007
Views: 2185
|
|
|
P1010148
Date: 11/29/1999
Views: 3309
|
|
|
2005_DSCF0103_2_1
Date: 02/04/2009
Views: 2619
|
|
|
dscn0320
Date: 12/31/1969
Views: 2634
|
|
|
smDSCN1681
Date: 12/31/1969
Views: 5530
|
|
|
031802_flap_hinge_slot
Date: 12/31/1969
Views: 2822
|
|
|
IM003577
Date: 11/18/2007
Views: 3945
|
|
|
Right_Plenum_front
Right Plenum, Front View
Date: 07/09/2012
Views: 12437
|
|
|
IMG_2191Ann
Date: 09/19/2008
Views: 3113
|
|
|
Door sill conduit run 11.
Date: 08/10/2010
Views: 2978
|
|
|
IMG_8167Ann
Date: 07/14/2008
Views: 2420
|
|
|
FlapDrive
Date: 12/31/1969
Views: 2155
|
|
|
IMG_2528
View from the other side. Must have down 5 test fit by the last one. Each resulted in finding things to correct. So I've been correcting things for a couple weeks now. More wire labels, adding connectors, checking pinouts, testing switches, finding is
Date: 01/14/2012
Views: 2908
|
|
|
LGLever10_001
Date: 03/02/2004
Views: 2519
|
|
|
Flap Mark Test Down
Check of the flap down. Every thing seemed OK.
Date: 07/01/2011
Views: 3074
|
|
|
Fitting_Wings_25
Date: 06/07/2007
Views: 3474
|
|