|
|
Pre-made harness 11.
Date: 03/26/2009
Views: 5702
|
|
|
Second and final pass of Port top wingskin bond on 1.
Date: 09/13/2010
Views: 6111
|
|
|
|
img0314copy
Date: 07/29/2007
Views: 3618
|
|
|
IMG_1469p
Cleaned up the tunnel area.
Date: 06/05/2011
Views: 4621
|
|
|
|
Fred fairing install 2.
Date: 04/04/2008
Views: 5520
|
|
|
Side by side of machined pin and folded pin.
Bob derates machined pins to 3 amps for mach 3 operations.
Date: 06/08/2010
Views: 6452
|
|
|
|
Wiring supplies 1.
Date: 02/20/2009
Views: 20026
|
|
|
Outboard strut anchor 3.
Date: 12/01/2009
Views: 6037
|
|
|
|
DSCN8175
Date: 09/18/2010
Views: 5813
|
|
|
Wing_Dolly_2_1
Date: 02/06/2006
Views: 5947
|
|
|
|
IMG_5743Ann
Date: 10/26/2007
Views: 5461
|
|
|
IMG_6977post
Width of ramp to trimmed corner
Date: 12/27/2009
Views: 6707
|
|
|
|
Select your Electrical Box design. Option A) on the right, option B) on the left and option C) on the next picture.
Date: 08/04/2003
Views: 11094
|
|
|
IMG_0048post
Date: 09/01/2010
Views: 4311
|
|
|
|
092902_frontview
Date: 12/31/1969
Views: 5426
|
|
|
012502_hinge_fix
Date: 12/31/1969
Views: 4324
|
|
|
|
DSCN5216
Date: 11/29/1999
Views: 4499
|
|
|
IMG_0241
Date: 04/15/2005
Views: 4152
|
|
|
|
DSCN6536
Date: 10/25/2009
Views: 5234
|
|
|
DSCN6336
Date: 10/11/2009
Views: 5085
|
|