|
|
Rivets
Next problem. Once the push rod end was fitted and drilled according to the manual the rivets provided were too short to go through the whole structure. Awaiting a response from Europa
Date: 09/03/2015
Views: 31765
|
|
|
DSCN6546
Date: 10/25/2009
Views: 4306
|
|
|
|
MODWingStrobePort4
Date: 06/23/2005
Views: 5452
|
|
|
Outside looking into my den 1.
Date: 07/24/2003
Views: 7928
|
|
|
|
CH23_28
Date: 10/23/2005
Views: 5142
|
|
|
Richard Kundel's exit 3.
Date: 06/06/2009
Views: 3888
|
|
|
|
Fuel_System_01_001
Date: 06/08/2007
Views: 7181
|
|
|
IMGA0109
Date: 11/30/2012
Views: 34555
|
|
|
|
DSCF0014
Date: 02/14/2009
Views: 6002
|
|
|
CH28_10
Date: 07/15/2006
Views: 5075
|
|
|
|
Oil_Cooling_Manifold_Switch_Check_Valve
Date: 12/31/1969
Views: 5800
|
|
|
dscn0285
Date: 12/31/1969
Views: 4038
|
|
|
|
ComAntenna00
Date: 02/05/2004
Views: 4994
|
|
|
DSCN6159
Date: 10/11/2009
Views: 4978
|
|
|
|
First pass of Port top wingskin bond on 2.
Date: 09/11/2010
Views: 4926
|
|
|
WingSet08Ann
Date: 07/12/2004
Views: 3417
|
|
|
|
35_G
Date: 06/19/2009
Views: 4936
|
|
|
IMG_7226
Here the urethane on the aluminum ledge has also been covered with cork. The cork both served to protect the tank and the urethane.
Date: 01/19/2014
Views: 9061
|
|
|
|
DSCF0019
Date: 02/14/2009
Views: 4742
|
|
|
CPC 2
Date: 02/21/2011
Views: 4629
|
|