|
|
IMG_8165Ann
Date: 07/14/2008
Views: 4610
|
|
|
nex_2013_08_24_04
As you see here the port side is done with rib 3 and 4. I didn't have photos of doing the layups.
Date: 08/25/2013
Views: 17645
|
|
|
|
Door hinge rebates 34.
Date: 11/06/2009
Views: 5129
|
|
|
Hudson_3
Date: 02/27/2009
Views: 5413
|
|
|
|
Panel population 3.
Date: 03/01/2010
Views: 8859
|
|
|
Strobe_power_supply_install_1
Date: 05/15/2009
Views: 6252
|
|
|
|
IMG_7664Ann
Date: 04/26/2008
Views: 5363
|
|
|
IMG_2190
Date: 01/10/2005
Views: 5996
|
|
|
|
PilotDoorIssue04Ann
Date: 05/01/2005
Views: 4049
|
|
|
DSCN4773Ann
Date: 10/07/2006
Views: 6089
|
|
|
|
DSCF0725
Date: 08/02/2003
Views: 7073
|
|
|
DSC_0136
Date: 09/21/2007
Views: 6098
|
|
|
|
IMG_0973Ann
Date: 08/06/2007
Views: 5169
|
|
|
IMG_0115
Date: 01/05/2007
Views: 5841
|
|
|
|
New_Cowl_01
New lip on cowl. A hole 14" X 7" was opened in the cowl. A piece of 4" PVC was used as a mold to form a lip on the edge of it, the idea being to create a low pressure area.
Date: 08/31/2011
Views: 197525
|
|
|
DSC_0193
Date: 05/15/2008
Views: 6014
|
|
|
|
110602_cowelflap6
Date: 12/31/1969
Views: 4514
|
|
|
032602_doorhinge5
Date: 12/31/1969
Views: 3484
|
|
|
|
Bild_009
Date: 10/31/2008
Views: 7179
|
|
|
How long does it take?
Date: 11/04/2007
Views: 5091
|
|