|
|
DoorLatch63Ann
Date: 05/12/2004
Views: 2939
|
|
|
IMG_0163Ann
Date: 01/03/2009
Views: 5384
|
|
|
|
Autopilot_13
Date: 05/19/2008
Views: 4745
|
|
|
DSCF0028_002
Date: 09/08/2009
Views: 7949
|
|
|
|
IMG_2435
Date: 10/02/2005
Views: 6062
|
|
|
dscn0797
Date: 12/31/1969
Views: 3900
|
|
|
|
24_04_08_vliegfoto_s_110
Date: 04/26/2008
Views: 5113
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 17562
|
|
|
|
Boots_and_Pipe
Date: 12/31/1969
Views: 5520
|
|
|
DSCN4640Ann
Date: 08/13/2006
Views: 5947
|
|
|
|
dsc09058
Wetting out stbd side.
Date: 01/24/2013
Views: 17479
|
|
|
IMG_3220
Similar staining and residual fuel on the port side as well.
Date: 05/18/2012
Views: 6038
|
|
|
|
Vent_Tunnel
Date: 05/03/2004
Views: 7351
|
|
|
24_04_08_vliegfoto_s_057
Date: 04/26/2008
Views: 3681
|
|
|
|
IMG_7314
The port side outlet installed. Fuel outlet to the fuel selector is on the starboard side and the outlet to the new sight gage on the port side.
Date: 02/17/2014
Views: 9031
|
|
|
DSC01172_Texted
Date: 12/31/1969
Views: 5635
|
|
|
|
Autopilot_22
Date: 05/19/2008
Views: 5081
|
|
|
Stbd_Door_ready_for_C_F_Layup
Date: 09/02/2004
Views: 5738
|
|
|
|
Jos_8
Date: 12/20/2006
Views: 5746
|
|
|
IMG_0010
Date: 04/13/2007
Views: 5719
|
|