|
|
101502_airbox
Date: 12/31/1969
Views: 4155
|
|
|
IMG_2460
Used our hydraulic punch to poke out the round holes. The rectangular holes were corner drilled and cut out with aircraft shears. Files were used to clean up the holes in shape and size.
Date: 10/27/2011
Views: 9590
|
|
|
|
Front fuse conduit run 26.
Date: 10/01/2010
Views: 6181
|
|
|
N4211W wing rigging 15.
Date: 10/09/2010
Views: 5484
|
|
|
|
CH8_6
Date: 12/31/1969
Views: 6437
|
|
|
HeadlinerMeasureSml
Date: 04/29/2005
Views: 4082
|
|
|
|
cliff8
Date: 12/31/1969
Views: 9231
|
|
|
Jan_strobe_1
Date: 02/18/2009
Views: 4094
|
|
|
|
IMG_0150
Date: 04/14/2005
Views: 4057
|
|
|
LGRetractPlates01
Date: 02/09/2004
Views: 4116
|
|
|
|
Vertex_ant_19
Date: 03/15/2009
Views: 6419
|
|
|
P4141324
Date: 04/16/2006
Views: 6642
|
|
|
|
dscn2823
Date: 12/31/1969
Views: 4632
|
|
|
Front fuse conduit run 1.
Date: 08/17/2010
Views: 11933
|
|
|
|
38_G
Date: 06/19/2009
Views: 7939
|
|
|
Spar clamp that allows a little fore and aft movement
Date: 11/27/2013
Views: 8531
|
|
|
|
DSCN5560Ann
Date: 02/19/2007
Views: 4849
|
|
|
dscn2098
Date: 12/31/1969
Views: 4519
|
|
|
|
DSCN5366
Date: 07/11/2009
Views: 7098
|
|
|
Battery cutoff switches 1.
Date: 02/22/2010
Views: 5868
|
|