|
|
fuel_6
Date: 12/31/1969
Views: 7407
|
|
|
IMG_7991Ann
Date: 06/29/2008
Views: 20661
|
|
|
|
IMG_2267Ann
Date: 10/26/2008
Views: 4988
|
|
|
IMG_6382Ann
Date: 12/11/2007
Views: 5304
|
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 183504
|
|
|
Results of first pass of Port top wingskin bond on 1.
Date: 09/12/2010
Views: 4806
|
|
|
|
DSC_0219
Date: 05/15/2008
Views: 5109
|
|
|
CH14_4
Date: 12/31/1969
Views: 5347
|
|
|
|
IMG_2456
Drilling for the rivets to hold the anchor nuts required novel technique. Eventually, all anchor nuts were installed.
Date: 10/25/2011
Views: 6893
|
|
|
IMG_0823
Same of port side.
Date: 09/03/2015
Views: 25746
|
|
|
|
Single point ground 3.
Date: 06/08/2010
Views: 5855
|
|
|
Photo_051307_010
Date: 05/13/2007
Views: 3933
|
|
|
|
IMG_0603
Date: 04/01/2009
Views: 7184
|
|
|
DSCN4006
Date: 10/31/2005
Views: 5844
|
|
|
|
Speyer germany
Speyer Germany
Date: 05/24/2009
Views: 8217
|
|
|
DSC01480
Date: 12/31/1969
Views: 4113
|
|
|
|
shorai batterry , 2 pound weight , 18 amps capacity
Date: 11/01/2015
Views: 9992
|
|
|
Turbo and Muffler blankets
Date: 12/11/2010
Views: 7109
|
|
|
|
DSCN8234
Date: 09/18/2010
Views: 7456
|
|
|
IMG_0297post
Date: 08/11/2009
Views: 7463
|
|