|
|
Making awful fit of lift pads correct 23.
Date: 10/14/2010
Views: 6158
|
|
|
Port Flap Bracket 1
Port outboard flap bracket completed
Date: 06/29/2011
Views: 4029
|
|
|
|
dsc09040
The gap from the bottom of the socket and the belly is as you see. The only way to get it all the way down was to lower the belly to 15" which was not considered an option. Belly hight is 16.0" with the axle width at 82.50" and axle cent
Date: 01/23/2013
Views: 19540
|
|
|
The_other_one
Date: 09/08/2007
Views: 271841
|
|
|
|
IM002968
Date: 10/30/2007
Views: 6079
|
|
|
IMG_0316
Date: 04/17/2005
Views: 4480
|
|
|
|
30062003144743_G
Date: 12/31/1969
Views: 3739
|
|
|
DSCF0025_002
Date: 09/08/2009
Views: 4423
|
|
|
|
InstrumentPanel58Ann
Date: 09/21/2004
Views: 3332
|
|
|
IMG_1144
Date: 08/30/2007
Views: 4267
|
|
|
|
CH6_3
Date: 12/31/1969
Views: 6868
|
|
|
DSCF0064
Date: 02/14/2009
Views: 13880
|
|
|
|
WingSet68Ann
Date: 07/29/2004
Views: 3278
|
|
|
DSCF0025
Date: 10/24/2010
Views: 4880
|
|
|
|
041002_rudder_cable4
Date: 12/31/1969
Views: 4157
|
|
|
CH14_8
Date: 12/31/1969
Views: 5067
|
|
|
|
IMG_6975post
Overall length of ramp
Date: 12/27/2009
Views: 5190
|
|
|
5_snaps
New snap bases bolted down and ready to go.
Date: 06/23/2011
Views: 3861
|
|
|
|
112302_airboxlid
Date: 12/31/1969
Views: 3832
|
|
|
Door hinge rebates 60.
Date: 11/12/2009
Views: 5426
|
|