|
|
StbdOutOutReinforce
Date: 12/28/2003
Views: 11493
|
|
|
CH17_37
Date: 12/31/1969
Views: 6154
|
|
|
|
B022704pant1
Date: 11/02/2005
Views: 5716
|
|
|
2005_1_16_33
Date: 02/03/2009
Views: 5448
|
|
|
|
DSCN6021Ann
Date: 05/06/2007
Views: 3839
|
|
|
Strobererer_2
Date: 05/18/2009
Views: 5215
|
|
|
|
DSCF0019_001
Date: 07/27/2009
Views: 3952
|
|
|
Mass_Balance_Tower_18
Date: 01/23/2006
Views: 4109
|
|
|
|
Wing connector 1.
Date: 04/27/2009
Views: 7715
|
|
|
dscn1702
Date: 12/31/1969
Views: 4405
|
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 159508
|
|
|
Front fuse conduit run 19.
Date: 09/14/2010
Views: 5741
|
|
|
|
Fin rib 1.
Date: 04/15/2009
Views: 7096
|
|
|
Sttrob_2
Date: 06/02/2009
Views: 5757
|
|
|
|
IMG_1236ann
Cut along the tape strip.
Date: 03/23/2011
Views: 4392
|
|
|
IMG_0769
Date: 01/04/2006
Views: 6207
|
|
|
|
IMG_5318
Date: 03/24/2013
Views: 26125
|
|
|
IMG_3213Ann
Date: 01/31/2009
Views: 4899
|
|
|
|
24_04_08_vliegfoto_s_115
Date: 04/26/2008
Views: 4023
|
|
|
DSCN6444
Date: 10/25/2009
Views: 4342
|
|