|
|
Control_Systems_47
Date: 01/23/2006
Views: 4201
|
|
|
attachment220
Date: 08/09/2004
Views: 5001
|
|
|
|
DSCN3662
Date: 12/31/1969
Views: 4773
|
|
|
DSC_0286
Date: 02/04/2009
Views: 7378
|
|
|
|
3.9oz, ready for paint.
Date: 07/15/2010
Views: 6443
|
|
|
IMG_2411
Date: 09/21/2005
Views: 6453
|
|
|
|
IMG_0310
Date: 04/17/2005
Views: 4454
|
|
|
Completion of Port top skin bond on 61.
Date: 09/22/2010
Views: 6003
|
|
|
|
2006SnF063
Date: 04/07/2006
Views: 6251
|
|
|
21082003201440_G
Date: 12/31/1969
Views: 4423
|
|
|
|
IMG_3334post
Requests to check the fuel delivery system. Started with the gascolator. Any large quantity of crap in the gascolator? Here's the fuel from the gascolator in the test vessel. A tiny bit of black crud from who knows what. But not enough to cause a pro
Date: 06/13/2012
Views: 7018
|
|
|
Cockpit camera clips and conduit
Date: 04/16/2009
Views: 7431
|
|
|
|
dscn2098
Date: 12/31/1969
Views: 4988
|
|
|
IMG_2525
Wiring in the instrument panel. From a couple weeks ago, not the final iteration.
Date: 01/14/2012
Views: 5702
|
|
|
|
DSCN4576Ann
Date: 07/09/2006
Views: 5046
|
|
|
060202_Flap_UP
Date: 12/31/1969
Views: 4734
|
|
|
|
DSCN5209
Date: 11/29/1999
Views: 4984
|
|
|
dsc08634
OK now that the plane is off the trailer and on its own wheel we were able to remove most of the trailer hardware and position the ribs. We also used the main bolts to hold the first rib in place. The other rib was left a little lower to be located once
Date: 04/15/2012
Views: 20713
|
|
|
|
P1010004b
Date: 12/31/1969
Views: 6538
|
|
|
j_Shoulder Harness Attachment Mod_4.jpg
Date: 03/22/2010
Views: 6438
|
|