Login
EuropaOwners Random Items
Advanced Search

Random Images

IMG_6379Ann

IMG_6379Ann

Date: 12/11/2007 Views: 4812

Fitting_Wings_28

Fitting_Wings_28

Date: 06/07/2007 Views: 6663

IMG_0025post

IMG_0025post

Date: 08/30/2010 Views: 7575

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 768859

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 768859

Random Items

Date: 02/01/2026
Owner: Guest
Size: 84 items
nextlast
13Commencement_of_underside_fairings

13Commencement_of_underside_fairings

Date: 09/03/2004
Views: 5855
IMG_0915post

IMG_0915post

I stuffed the brake line back into the aircraft, tied it all down and screwed it to the swing arm. Bolted the new caliper to the brake disk and torqued it to 90 in-lbs.

Date: 07/01/2010
Views: 4311
DSCN3620

DSCN3620

Date: 01/19/2005
Views: 7771
Making awful fit of lift pads correct 30.

Making awful fit of lift pads correct 30.

Date: 10/15/2010
Views: 5706
img0856copy

img0856copy

Date: 07/29/2007
Views: 3728
DSCF0028

DSCF0028

Date: 10/24/2010
Views: 6961
Baggage_Area_03_002

Baggage_Area_03_002

Date: 05/19/2008
Views: 4545
MG_2875

MG_2875

Date: 03/17/2008
Views: 6075
Flap fairing 3

Flap fairing 3

Date: 05/30/2005
Views: 52150
IMG_0107

IMG_0107

Date: 12/02/2006
Views: 4791
2004_12_20_15

2004_12_20_15

Date: 02/03/2009
Views: 7378
DSCN6176

DSCN6176

Date: 10/11/2009
Views: 6123
IMG_0197

IMG_0197

Date: 04/14/2005
Views: 4265
The First Spike

The First Spike

Date: 12/29/2013
Views: 6649
Panel_1_Layout

Panel_1_Layout

Date: 09/02/2004
Views: 7614
first flight

first flight

Date: 03/03/2016
Views: 8403
Spine 4.

Spine 4.

Date: 09/22/2009
Views: 6004
1/2" ball end-mill on order (McMaster) to to mill a pocket  in the brake master cylinder directly above the mounting holes

1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes

Date: 12/13/2013
Views: 8433
IMG_5416

IMG_5416

Date: 06/27/2013
Views: 6938
IMG_9571post

IMG_9571post

The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin

Date: 06/12/2010
Views: 6619
nextlast
Page: 1 2 3 4 5
Powered by Gallery v2.3