|
|
Port wing 8.
Date: 09/15/2009
Views: 5832
|
|
|
IMG_6966
Selfie of the protective gear needed. There was a LOT of fiberglass dust flying during the cutting.
Date: 10/17/2013
Views: 10293
|
|
|
|
Mod69_01
Date: 06/05/2005
Views: 5463
|
|
|
P1010639
Date: 11/29/1999
Views: 28941
|
|
|
|
TrimPortDoorAnn
Date: 06/02/2004
Views: 3577
|
|
|
42aileron_work2
Date: 12/31/1969
Views: 3489
|
|
|
|
DSCN6210
Date: 10/11/2009
Views: 5877
|
|
|
IMG_0901
Date: 11/22/2005
Views: 5909
|
|
|
|
DSCF0032_002
Date: 10/26/2009
Views: 4734
|
|
|
Doorlatch02Ann
Date: 05/04/2004
Views: 3446
|
|
|
|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 7705
|
|
|
Photo_051307_006
Date: 05/13/2007
Views: 4458
|
|
|
|
DSC00054
Date: 12/31/1969
Views: 6943
|
|
|
DSC_0234
Date: 05/15/2008
Views: 5369
|
|
|
|
IMG_1449p
Greatly simplified fuel plumbing, all cleaned up and tied down. Not a particularly good pic. I'll see if I can get a better one.
Date: 06/04/2011
Views: 4461
|
|
|
IMG_1423ann
Ran the left and right brake line up through the tunnel.
Date: 12/20/2010
Views: 5263
|
|
|
|
Bud 2
Date: 01/06/2010
Views: 7607
|
|
|
DSCN6054
Date: 10/11/2009
Views: 5687
|
|
|
|
DSCN3941
Date: 09/30/2005
Views: 4409
|
|
|
IMG_1470ann
2011 01 26 January proves to be as cold and nasty as December. Finally have a day to work. Start by aligning the new outer flap brackets to make ready for mounting.
Date: 01/26/2011
Views: 4712
|
|