|
|
DSCN6136Ann
Date: 06/17/2007
Views: 7081
|
|
|
033102_luvers5
Date: 12/31/1969
Views: 3773
|
|
|
|
Battery Box Attachment_3
Date: 04/11/2010
Views: 5261
|
|
|
Mod_70_01
Date: 04/15/2006
Views: 10615
|
|
|
|
IMG_2858
Date: 12/03/2008
Views: 5830
|
|
|
Top fit 4.
Date: 04/05/2009
Views: 6724
|
|
|
|
Rotax_oil_line_1
Date: 03/24/2009
Views: 7102
|
|
|
RudderMount14Ann
Date: 06/29/2004
Views: 6616
|
|
|
|
IMG_0105post
Date: 09/03/2010
Views: 4921
|
|
|
CH21_10
Date: 04/24/2005
Views: 5450
|
|
|
|
IMG_5126
Date: 12/02/2012
Views: 8815
|
|
|
Mass_Balance_Tower_35
Date: 01/23/2006
Views: 5276
|
|
|
|
GJ7I2397
Date: 07/09/2006
Views: 5237
|
|
|
IMG_2111
Date: 12/11/2004
Views: 5586
|
|
|
|
DSC00460
Date: 04/03/2010
Views: 6642
|
|
|
IMG_8659
Date: 07/11/2014
Views: 7553
|
|
|
|
imm029_30A
Date: 09/03/2009
Views: 8311
|
|
|
Smooth rigging 5.
Date: 10/22/2010
Views: 6667
|
|
|
|
23102010496
Date: 10/23/2010
Views: 7155
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 194084
|
|