|
|
IMG_7779Ann
Date: 06/14/2008
Views: 4492
|
|
|
Starboard wing 32.
Date: 06/16/2009
Views: 5652
|
|
|
|
109_0981_IMG
Date: 01/31/2004
Views: 6415
|
|
|
Mid panel insert 12.
Date: 11/17/2010
Views: 8880
|
|
|
|
Flap cross tube clearance.
Date: 11/05/2010
Views: 3963
|
|
|
2005_DSCF0042_23_1
Date: 02/04/2009
Views: 6140
|
|
|
|
DSCN6223
Date: 10/11/2009
Views: 6782
|
|
|
DSCN6371
Date: 10/11/2009
Views: 6040
|
|
|
|
IMG_0023
Date: 07/16/2006
Views: 7371
|
|
|
Lower horizontal done 1.
Date: 05/06/2009
Views: 5661
|
|
|
|
Cutting out fuse panel 3.
Date: 04/18/2009
Views: 5856
|
|
|
Pre-made harness 10.
Date: 03/26/2009
Views: 6581
|
|
|
|
IMG_9570ann
2010 06 12 - Completed the plumbing for the new mechanical fuel pump this morning. Fire shield on all fuel lines. Everything connected in the proper sequence.
Date: 06/12/2010
Views: 6178
|
|
|
092902_airduct
Date: 12/31/1969
Views: 4295
|
|
|
|
CH22_8
Date: 12/31/1969
Views: 4986
|
|
|
OutriggerMod15
Date: 04/01/2004
Views: 21283
|
|
|
|
IMG_1138
Date: 03/22/2004
Views: 7917
|
|
|
1_Door_Knobs
The new door knob mounting hardware is a stainless steel "binding post" acquired from McMaster-Carr. These things are available in myriad materials and sizes. There just happened to be a perfect size in the stainless steel variety which I pref
Date: 06/23/2011
Views: 7122
|
|
|
|
IMG_2179
Date: 01/05/2005
Views: 5161
|
|
|
Control_Systems_65_13
Date: 06/03/2007
Views: 4572
|
|