|
|
DSC00073
Date: 12/31/1969
Views: 6543
|
|
|
dscn2175
Date: 12/31/1969
Views: 4487
|
|
|
|
IMG_7233
2-ply fiberglass strips were made up to be bonded to the inside of the unit. These strips went on all 4 sides. Here the strip is being bonded to the aft wall.
Date: 01/26/2014
Views: 9972
|
|
|
CH18_26
Date: 12/31/1969
Views: 6182
|
|
|
|
IMG_0134
Date: 12/04/2006
Views: 4599
|
|
|
IMG_1607
Date: 04/15/2010
Views: 10366
|
|
|
|
Raimo 7
Date: 05/22/2007
Views: 6394
|
|
|
tailmod2
Date: 12/31/1969
Views: 8396
|
|
|
|
IMG_6622Ann
Date: 01/27/2008
Views: 4942
|
|
|
DSCF0035_001
Date: 09/08/2009
Views: 4320
|
|
|
|
Arts work area 2
Date: 11/06/2007
Views: 5627
|
|
|
nice portrait
Date: 03/04/2016
Views: 6210
|
|
|
|
Port front spacer is thicker than port rear spacer.
Date: 10/12/2009
Views: 5204
|
|
|
Look Ma, no hatches!
Date: 07/01/2017
Views: 15111
|
|
|
|
DSCN4782Ann
Date: 10/15/2006
Views: 4707
|
|
|
DSC_0067
Date: 08/31/2007
Views: 4676
|
|
|
|
DSCF0013
Date: 06/28/2009
Views: 4139
|
|
|
Ceiling panel wiring begins
Date: 03/05/2009
Views: 6216
|
|
|
|
IMG_1466
Date: 02/13/2010
Views: 7864
|
|
|
IMG_1109
Date: 03/18/2004
Views: 5912
|
|