Login
EuropaOwners Random Items Eric Engineering increase in force needed when cable is deflected 2
Advanced Search
View Slideshow (Fullscreen)

Random Images

IM002173

IM002173

Date: 10/30/2007 Views: 8118

GJ7I2431

GJ7I2431

Date: 07/09/2006 Views: 4277

DSCF0715

DSCF0715

Date: 08/02/2003 Views: 5864

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 724613

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 724613

Eric Engineering increase in force needed when cable is deflected 2

I wanted force using 4" arm and 8" arm, the numbers are the same as the prior using a 6" arm except there is different deflection, so that will skew things a little.

Y13-12-02

Date: 12/03/2013
Size:
Full size: 4896x3672
Eric Engineering increase in force needed when cable is deflected 2

Photo Properties

summary  details
Make SONY Model DSC-HX20V
Aperture Value f/3.2 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 4.45 mm
ISO 125 Metering Mode Multi-Segment
Shutter Speed Value 1/30 sec Date/Time Mon 02 Dec 2013 05:45:22 PM UTC
Powered by Gallery v2.3