Date: 06/03/2007 Views: 5985
Date: 10/11/2009 Views: 5075
Date: 06/07/2007 Views: 6577
Date: 08/23/2023 Views: 725315
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.