Login
EuropaOwners Random Items Port wing 4.
Advanced Search
View Slideshow (Fullscreen)

Random Images

041402_insterment_panel

041402_insterment_panel

Date: 12/31/1969 Views: 3755

IMG_5712ann

IMG_5712ann

Date: 07/25/2009 Views: 4799

img0383copy

img0383copy

Date: 07/29/2007 Views: 3626

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693471

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693471

Port wing 4.

Goiter removal, (seen on prior pict).
Aeropoxy light was applied heavier than you could believe which netted just about right.
Began sanding with 80 grit to about 1/16" thick, then went down to 120 grit, feathered in with 180/320 grit.
It needs an application or two of 3M flowable finishing putty to fill pinholes, voids and deeper sanding marks.
Very pleased with this first pass.
Y9-09-15

Date: 09/15/2009
Size:
Full size: 2592x1944
Port wing 4.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Tue 15 Sep 2009 05:50:56 PM UTC
Powered by Gallery v2.3