Marked area to be cut out after stabalizing with 4 more rivets.
Date: 07/19/2010
Views: 5307
Rudder_hdw_1
Date: 05/14/2009
Views: 5951
DSCN5665Ann
Date: 04/02/2007
Views: 4325
Newest Image
EAA SITE
Date: 08/23/2023
Views: 693521
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 693521
DSCN5634Ann
Connected the fuel lines to the new steel AN fittings. Installed the fittings in the firewall and applied the nuts. The upper firewall was then screwed into place.