Login
EuropaOwners Random Items IMG_0178Ann
Advanced Search
View Slideshow (Fullscreen)

Random Images

Mass_Balance_Tower_30

Mass_Balance_Tower_30

Date: 01/23/2006 Views: 5445

2005oct08_32

2005oct08_32

Date: 11/09/2005 Views: 5782

3M Flowable Finishing Putty 3.

3M Flowable Finishing Putty 3.

Date: 08/23/2009 Views: 7159

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 769011

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 769011

IMG_0178Ann

The bearing block loosely bolted to the repair plate. You can see that the rivets were countersunk to the plate. I'll need to make up some sort of heat unit (100 watt drag light?) to keep the thing warm once it is bonded in place using Araldite. I will also add another couple plies of BID to the underside of the floor to "repair" that broken fiberglass before the repair plate goes on.

Date: 01/12/2009
Size:
Full size: 1600x1200
IMG_0178Ann

Photo Properties

summary  details
Make Apple Model iPhone
Aperture Value f/2.8 Color Space sRGB
Date/Time Mon 12 Jan 2009 04:55:38 PM UTC GPS: Latitude 33.200166666667
GPS: Longitude 97.1725
Powered by Gallery v2.3