Vertical upright, swing-arm and generator install 2 of 7.
Date: 08/12/2003
Views: 8505
Newest Image
EAA SITE
Date: 08/23/2023
Views: 704654
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 704654
IMG_0400
A hole had to be cut into the tailplane rip by the previous owner to remove excess redux from the factory build that was preventing complete insertion of the torque tube. This was done on europa technical authority. to close the hole disks of 4 ply composite where glued with redux over the holes and two plies of bid placed over the top.