Date: 10/29/2003 Views: 4932
Date: 09/04/2010 Views: 4312
Date: 05/29/2006 Views: 6034
Date: 08/23/2023 Views: 720437
The narrow washer or spacer was bonded down with J-B Weld and allowed to cure for two days. The brake was put back on the landing gear and the banjo hose end fastened down.