Login
EuropaOwners Random Items Front fuse conduit run 25.
Advanced Search
View Slideshow (Fullscreen)

Random Images

912 ULS oil leak 1

912 ULS oil leak 1

Date: 03/11/2011 Views: 4357

DSC01502

DSC01502

Date: 12/31/1969 Views: 10044

Pete Mk1 drive for Mk2 tailwheel.

Pete Mk1 drive for Mk2 tailwheel.

Date: 03/09/2010 Views: 21853

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 788600

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 788600

Front fuse conduit run 25.

After filling outer surface of cover with 3M Flowable Finishing putty and cleaning up round fit of cover and flange, JB KWIK temporary holds cover in place to allow sanding to blend cover to conduit.
You can see 3, #2 trilobal screws which have been cut shorter and sanded to 45°.
G-10 "nutplates" will be JB KWIKed to conduit flange, then glassed over with 3 layers of thin model aeroplane cloth.
A little more fill and slight trimming, then conduits will be clecoed to fuse and Reduxed in place.
Y10-09-29

Date: 09/27/2010
Size:
Full size: 2592x1944
Front fuse conduit run 25.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Tue 28 Sep 2010 02:22:20 AM UTC
Powered by Gallery v2.3