Login
EuropaOwners Random Items Making awful fit of lift pads correct 39.
Advanced Search
View Slideshow (Fullscreen)

Random Images

DSCN6218

DSCN6218

Date: 10/11/2009 Views: 7468

108_0814_IMG

108_0814_IMG

Date: 10/12/2003 Views: 7317

Flap_Motor_Installation_12

Flap_Motor_Installation_12

Date: 11/27/2007 Views: 4875

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 705810

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 705810

Making awful fit of lift pads correct 39.

OK, the fit is nice enough, time to get to 4 BID.
The Port side is in need of scuff sanding.
36 grit then 80 grit.
Y10-10-17

Date: 10/16/2010
Size:
Full size: 1800x1350
Making awful fit of lift pads correct 39.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 1/52 sec Date/Time Sat 16 Oct 2010 12:19:47 PM UTC
Powered by Gallery v2.3