Login
EuropaOwners Random Items Vertical upright, swing-arm and generator install 7 of 7.
Advanced Search
View Slideshow (Fullscreen)

Random Images

DSC_0161

DSC_0161

Date: 09/21/2007 Views: 4710

P8310044

P8310044

Date: 09/03/2007 Views: 8195

DoorRearLatchLights05Ann

DoorRearLatchLights05Ann

Date: 08/14/2005 Views: 3435

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693450

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693450

Vertical upright, swing-arm and generator install 7 of 7.

After testing various spindle diameters and surface roughness I settled on a 5/8" diameter with a light knurled finish. With the spindle still spinning in the lathe I took off the sharp edges of the knurl with 220 grit wet and dry sandpaper.
As I mentioned earlier it is imperative that the motor shaft is not exposed to any side loading or trauma greater than you can apply with your fingers.
Thus I drilled the bore hole slightly undersized, then ran a 5/16"reamer through to get a nice round and perfectly sized hole. This gives a great fit but requires tapping the spindle into place which is unacceptable. To prevent this required and undesirable tapping, I over-sized the hole a few thousands by running a 5/16 drill through several times.
After this last operation the spindle can be installed with your fingers only.

Y11-09-17

Date: 08/06/2003
Size:
Full size: 3040x4048
Vertical upright, swing-arm and generator install 7 of 7.

Photo Properties

summary  details
Make FUJIFILM Model FinePix S7000
Aperture Value f/2.9 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 12 mm
ISO 200 Metering Mode Multi-Segment
Shutter Speed Value 1/60 sec Date/Time Wed 06 Aug 2003 01:35:35 PM UTC
Powered by Gallery v2.3