Brackets are mounted. Wayne is about half way done with PCB.
Date: 07/15/2010
Views: 7840
DSCF0007_001
Date: 07/27/2009
Views: 5578
CH8_1
Date: 12/31/1969
Views: 8555
Newest Image
EAA SITE
Date: 08/23/2023
Views: 771387
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 771387
IM001693
One of the outer bushings got drilled through with a larger drill used for drain on bottom during accelerated construction. Thus pip pin could not grab. Next size up pip pins were sent, but we chose solid shoulder screw retention.