Date: 06/07/2008 Views: 5120
Date: 12/31/1969 Views: 4320
Date: 04/17/2013 Views: 88038
Date: 08/23/2023 Views: 768769
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.