Date: 04/25/2007 Views: 6167
Date: 03/02/2009 Views: 4446
Date: 08/20/2003 Views: 4637
Date: 08/23/2023 Views: 693451
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.