Date: 08/10/2009 Views: 5647
Date: 11/29/1999 Views: 6688
Date: 07/01/2005 Views: 4234
Date: 08/23/2023 Views: 748481
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.