Login
EuropaOwners Random Items Mod70_09Ann
Advanced Search
View Slideshow (Fullscreen)

Random Images

ShopWelcome

ShopWelcome

Date: 12/31/1969 Views: 9312

Fuel_System_02_001

Fuel_System_02_001

Date: 06/08/2007 Views: 4351

I'm going to Redux the nut in place and Redux/Flox the thread extender hang-over

I'm going to Redux the nut in place and Redux/Flox the thread extender hang-over

Date: 12/13/2013 Views: 6889

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 793521

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 793521

Mod70_09Ann

Forming the upper bracket for the containment structure. Layup of 2 plys of BID between peel-ply and poly sheet. Formed between the top of the structure and the fuselage. Two wood blocks clamped to the sides to hold the layup tight and flat against the structure sides.

Date: 07/17/2005
Full size: 480x640
Mod70_09Ann

Photo Properties

summary  details
Make NIKON Model E775
Aperture Value f/2.8 Color Space Uncalibrated
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash Focal Length 5.8 mm
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sun 17 Jul 2005 02:25:38 PM UTC
IPTC: Caption
Powered by Gallery v2.3