Login
EuropaOwners Random Items DSCN4737Ann
Advanced Search
View Slideshow (Fullscreen)

Random Images

Fit baggage bay bulkhead - floor before fitting fairings Frans

Fit baggage bay bulkhead - floor before fitting fairings Frans

Date: 12/08/2010 Views: 5646

Klaus-Building-His-Plane

Klaus-Building-His-Plane

Date: 10/20/2009 Views: 22378

imm030_31A

imm030_31A

Date: 09/03/2009 Views: 9901

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693573

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693573

DSCN4737Ann

Finished the assembly of the heater inlet flaps to their respective hinges. Used countersunk flush pop-rivets with the countersunk head against the surface that will contact the cooling duct. I had purchased a nice 2 1/8" hole saw to cut the holes in the duct. Unfortunately, the arbor I purchased to go with the saw (size directed by the packaging) proved to be too small. Was unable to continue.

There will be no update next weekend, 30 Sep & 1 Oct as other obligations interfere with Europa work. Next update will be 7/8 Oct.

Date: 09/24/2006
Size:
Full size: 640x480
DSCN4737Ann

Photo Properties

summary  details
Make NIKON Model E775
Aperture Value f/7.9 Color Space Uncalibrated
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash Focal Length 5.8 mm
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sun 24 Sep 2006 06:34:05 PM UTC
IPTC: Caption
Powered by Gallery v2.3