Ultimate ventilator installation and associated repair 13.
Date: 07/12/2009
Views: 7069
Ultti_vent_2
Date: 07/12/2009
Views: 5595
Newest Image
EAA SITE
Date: 08/23/2023
Views: 725710
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 725710
IMG_0400
A hole had to be cut into the tailplane rip by the previous owner to remove excess redux from the factory build that was preventing complete insertion of the torque tube. This was done on europa technical authority. to close the hole disks of 4 ply composite where glued with redux over the holes and two plies of bid placed over the top.