Date: 12/31/1969 Views: 3927
Date: 05/19/2008 Views: 3580
Date: 02/15/2008 Views: 6147
Date: 08/23/2023 Views: 720433
The narrow washer or spacer was bonded down with J-B Weld and allowed to cure for two days. The brake was put back on the landing gear and the banjo hose end fastened down.